In short

Pallet footprint determines rack beam spacing, aisle width, conveyor dimensions, dock door count and effective storage density. Deciding it at design stage costs nothing; deciding it at commissioning means either accepting a compromised layout or rebuilding something expensive. The questions that need answering are about the product and the handling method, and they can be answered long before a building exists.

Talk to us about this

If this piece describes a problem you actually have, describe it back to us in the message field. You will get a written answer from a person within one business day.

We reply by email only — no marketing list.

US or Canada, 10 digits — format as (513) 555-0142.

US ZIP like 45241, or Canadian like K1A 0B1.

Required fields are marked *. Your details go to our Evendale team and nowhere else — see the privacy policy.

The recycling bay, with "Pallet Recycling — Reuse, Repair, Recycle" and "Wood Only" signage, a bin of offcuts and damaged pallets waiting to be dismantled.
The recycling bay. Wood only — and a person pulls painted and chemically stained units before anything reaches a grinder.
Looking into a loaded trailer stacked with new EPAL and EUR-stamped Euro block pallets, banded and strapped in rows.
A trailer of EPAL block pallets loaded two-across. Every unit stamped, banded and counted before the doors close.

What the footprint actually determines

Design elementDriven byCost to change later
Rack beam length and spacingPallet footprint and load widthHigh — re-beaming a facility
Aisle widthPallet depth plus handling equipment turning radiusVery high — floor layout
Storage density per square footFootprint and overhangVery high
Conveyor width and roller pitchBottom deck geometry and footprintHigh
AS/RS bay dimensionsFootprint and height toleranceExtremely high
Dock door countPallets per trailer and throughput rateHigh
Trailer loading patternFootprint against 98-in interior widthFree — but only if the footprint suits it

The questions that can be answered before the steel arrives

  1. What is the product, what does a unit load weigh, and how is that weight distributed?
  2. Does the load overhang any standard footprint? Measure a real one, filled and settled, not a drawing.
  3. Does it go into racking, and for how long? That sets the racked rating and the creep derate.
  4. Is handling manual, automated, or mixed — and will that change within the building's life?
  5. Does anything export? That decides treatment and adds kiln time to every lead time.
  6. Do pallets come back, or leave permanently? That decides owned versus pooled versus expendable.
  7. What is the throughput rate in pallets per hour? That, with pallets per trailer, sets dock count.
  8. Who receives the product, and do they have a footprint requirement of their own?

Eight questions. None requires a building. All of them are cheaper to answer on paper than to discover during commissioning, and most of them are things the operations team already knows.

Build a mock-up

The single most useful thing we do at design stage is build one to five prototype pallets and send them to be loaded with real product. It takes five to seven business days and it consistently catches things no drawing does — the case pattern that leaves a corner unsupported, the bag that slumps three inches further than anybody expected, the deck gap the small carton drops into.

Appendix: the data behind this

Every piece on this site closes with the slice of our operating record that bears on what it argues. The full record is published at /resources/operating-record.

From the Evendale floor

Footprint against equipment, before the steel is ordered

Rack beam spacing, aisle width and dock count all follow from the row you pick here. Pick it at design stage and it is free.

Footprint53-ft van48-ft van40-ft container20-ft container45-ft HCEmpty, 53-ft
48 × 402824201024~560
48 × 48242218922~480
42 × 422624201024~600
36 × 363933301434~700
48 × 45262218922~520
1200 × 8003026251128~520
1200 × 10002422201024~460
Measured 1 September 2025 – 31 August 2026